The bump occurred Saturday evening. No one could have predicted it, hopefully a
once in a lifetime storm. I made a
slideshow movie to share what happened.
It might have been a huge bump, but it was just a bump. We will recover and move on. It is now two days since the bump occurred and
I am not sad. Rick is not sad. Instead we praise God for protecting us and
the animals. He is good. The bump was really a blessing. When the cabins are built they will be stronger
and safer because of Saturday’s bump.
Monday, August 13, 2012
The Storm
Every once in awhile life throws bumps in our way. We are going along our merrily way and then
bam—a bump. That just happened here at The
Ranch. As I shared Saturday afternoon we
had spent all week working towards and achieving electricity for the future
cabins that will be built. We had our
plans all laid out, at least for the next few days. Rick needed to address some issues in San
Antonio and so the plan was for him to go spend a few days there. Then-bump.
It took less than one minute for all our plans to change.
Saturday, August 11, 2012
Getting Electricity, Continued
This has been a very busy and exciting week. As I shared last time we have spent the past
few months working towards installing electricity for the cabins we intend to
build. Step one was to clear the area,
not an easy task as it was full of large rocks and Mountain Cedar trees. But working together that task was completed
in a couple of weeks. Then PedernalesElectric Coop came out with their surveying equipment and marked off the
area. Next Rick spent a week building
the rack, which in itself was not an easy task.
This part of Texas is rocky. There are rocks of every size on this
property. I am currently digging a
trench so I can build a raised garden bed and I am picking out tiny pieces of
gravel and small rocks out of the few inches of top soil I am clearing
away. Under that few inches of top soil I
am finding larger chucks of rocks and then bedrock. The garden is on the South side of the property. There is a slight downward slope to the land,
the North side being a bit higher in elevation then the South side. The cabins will be built on the North side
which is solid rock. The area where the
power pole and cabins will be built is solid rock, there is no top soil. Around here I like to joke that we take the
Bible literally. These cabins are being built on solid rock, no sand for us.
“Therefore
whoever hears these sayings of Mine, and does them, I will liken him to a wise
man who built his house on a rock. And
the rain came down, and the floods came, and the winds blew and beat on that
house. And it did not fall, for it was founded on a rock. And everyone who hears these sayings of Mine
and does not do them shall be compared to a foolish man who built his house on
the sand. And the rain came down, and
the floods came, and the wind blew and beat on that house. And it fell, and
great was its fall.” (Matthew 7:24-27)
Obviously,
one does not dig a hole using a shovel when dealing with solid rock. Rick used a hammer drill with a one inch
chisel to make the holes to put the two steel pipes needed to support the
electrical rack. Then he used cement to
secure the pipes in the holes. That task
alone took him two days of hard physical labor.
He would then spend several days building the rack and wiring it. He also was required to build the weatherhead (the long metal pole with wiring inside that is attached to an electrical
pole and covered to protect the wires from rain). In the city the power company and
an electrical contractor would build and install the weather head and rack, but
out in the country the home owner is required to complete this job. Since we are installing a lot more power than
a single family dwelling would use, bigger wire was needed. Minimum code called for 3 strands of copper
wire 1 inch (2.54cm) thick. Each strand
was 30 feet (9.14 meters) long. Not only
was this wire heavy but to fit in the weather head it had to be bent, a very
difficult task that required my help.
Most
of what Rick was required to do would have been done by a licensed electrician
if we were in the city. Out here in the
country there are only a few licensed electricians within a hundred mile radius
willing to come out this far. Thankfully
Rick has enough electrical experience that with a little guidance from folks at
the Electrical Supply Store he was able to accomplish this very difficult
task. If I had been forced to hire a
licensed electrician, this project would have cost several thousand dollars
more. As it was the cost of materials to
build that rack and weather head were well over $2000 and I had to pay
Pedernales Electric Coop over $4000 for their part of the job.
Getting
that rack built required several trips to both Rocksprings and Kerrville in
search of needed items. Last week we
basically made 5 trips in 6 days as Rick faced one challenge after another. Since we had no way of knowing when Pedernales
would come out to install the power poles, Rick had to work fast. I prayed that he would be totally finished
before they arrived. He finally finished
his part of the job on Wednesday, then moved some very large rocks (maybe 100
pounds/46 kg or more each) out of the way for the trucks. Then in answer to prayer Pedernales arrived Thursday
morning. God answers prayer perfectly.
It took Pedernales five large trucks, a crew
of men, and 3 ½ hours to complete the job.
Fortunately they arrived in Thursday morning when both of us were home
and it was relativity cool. The morning
low that day was 76 (25c) and very humid.
Most mornings we average in the low 70’s (21+c). We have been hitting 100f (38c) or above most
days for several weeks now. By noon
(often 11am for me) it is usually to hot and sunny for either of us to be
outside working. God knew I wanted to
take lots of pictures and He arranged for Pedernales to come in the morning so
I could do just that. I am not sure I
would have been able to stay out in that sun if they had arrived in the
afternoon. God is good.
I
took over 450 pictures and so it is going to take me some time to sift through
them. As soon as I am done I will share
more of that day with you all.
Saturday, July 28, 2012
Getting Electricity
As I sit here I can look out the window at my now four week old tail wagging kid lying in the sun chewing the cud. He looks so content. Maybe because he never got his mother’s colostrum, he has seemed to lag behind Midnight (who I got at age two weeks) in development. Sport has only been enthusiastically eating weeds for the past week and a half and whereas he should have been switched to three bottles a day at week two, it took tell week three to fully make the change. But he now seems to be doing well and is growing nicely. He clearly has little horns poking out from the top of his little head. You just have to look closely.
Since it is currently the hottest part of the day the other goats are no doubt resting in a grove of Mountain Cedar trees that provide a blanket of nettles to lie on and a canopy of shade from above to keep them cool.
The cats are off hiding under the house or in the cabin or who knows where, taking their afternoon siesta. This time of day I never see them.
Rick and I spend most mornings outside working but around noon both of us have to come inside to eat, rest, and do indoor type work. It is just too hot to be outside in the middle of the afternoon. This summer has not been as brutal as last summer, but we have had our share of 100 degree days (38c and above).
Though the animals need to be tended to every day, they are not our primary focus. Even when we were busy building the goat enclosure, in the back of our minds was our primary mission—people. In recent weeks more of our attention has been turned to that mission.
The primary reason this land was purchased has always been to provide a place for people with Multiple Chemical Sensitivities to live. For the past few months we have been in the planning stage of building one room cabins. These cabins will come equipped with a kitchenette and a bathroom will be shared between two cabins. The cabins will not be luxurious, but will be a roof over someone’s head. They will also have electricity.
Electricity does not just happen. It takes a lot of work and a lot of money. About a month ago Rick and I drove to Junction, about 50 miles (80.47km) north of here, to talk to someone at the Pedernales Electric Coop. office.
In the 1930’s most of rural America did not have access to electricity. It took an act of the federal government to change that. By providing federal assistance, electric coops could be formed whose sole purpose is to construct power lines and provide electricity to ranches and farms across the nation. Pedernales is one of those coops.
When I first moved to this property Pedernales had already installed a power pole and electricity to the house. All I had to do was join the coop for a small fee. Unlike for-profit electric companies that most people in the US get their electricity from, Pedernales is a not-for-profit cooperative, which means I am not just a customer, I am a member of Pedernales cooperative. As a member I vote in elections for board members, have a vote in changing any and all governing documents, and I have a say in what goes on.
Though there is a power pole on the property, it feeds the house and the bill is in my name. It just made since to have another pole installed in the ministries name and located where the cabins will be built. So Rick and I drove to the Pedernales office in Junction, TX to learn what it will take to have a separate power pole installed. The short answer is a lot of work and money.
The day after we visited the Pedernales office two engineers came out to the property to take a good look at what we wanted. With clear instructions of the process we then got to work.
Step one: Clear the land. We spent several weeks cutting down Mountain Cedar trees and hauling the branches away. There were also huge rocks that had to be removed. Pedernales requires a 20 foot (6.10meters) wide easement for their power poles and rocks and stumps have to be no higher than 3 inches (6.72cm) for their trucks to safely pass over. Since the power pole will be installed close to the property line, we were fortunate that Pedernales only required us to clear out a 10 foot (3.5meters) wide path. Even that was a lot of hard backbreaking work. But we got it done.
Step two: Survey. Once the land was cleared the two Pedernales engineers returned to survey the area and place markers where the poles and other equipment would go. This task was accomplished last week.
Step Three: Payment. We were told it would take a week to get the paperwork completed and the actual cost to be calculated. Yesterday Rick and I drove back to the Pedernales office in Junction so that I could sign the paperwork and make the necessary payments. Pedernales demands payment up front, which I can fully understand. The total cost to them came out to $4256.77. This total includes the cost of making the ministry a member of Pedernales, but by doing so we avoid taxes. It will also make it much easier to know how much electricity each cabin is using.
Step Four: Building the rack: Before Pedernales will come out to install the power pole, we have to build a rack for the electrical boxes. So as soon as we were done at the Pedernales office, we drove another 50+ miles (81+km) to Kerrville, where we stopped at the Electrical Supply store. The materials to build that rack came to $2095.94.
This morning Rick started the process of building the rack. This is not an easy job as he must put two metal pipes a minimum of 24 inches (60.96cm) into the ground. Jesus said a wise man builds his house on rock and not sand. Well, these cabins are being built on solid rock. Rick has to dig two 24 inch holes into solid rock. Not an easy job.
Step Five: Once Rick finishes building the rack Pedernales will come out and install the power pole and hook up the electricity.
“Therefore whoever hears these sayings of Mine, and does them, I will liken him to a wise man who built his house on a rock. And the rain came down, and the floods came, and the winds blew and beat on that house. And it did not fall, for it was founded on a rock. And everyone who hears these sayings of Mine and does not do them shall be compared to a foolish man who built his house on the sand. And the rain came down, and the floods came, and the wind blew and beat on that house. And it fell, and great was its fall.” (Matthew 7:24-27)
(Please remember Alpha Omega Christian Communities For The Chemically Injured is a not-for-profit Christian ministry. We are dependent on the generous contributions of God’s people.)
Since it is currently the hottest part of the day the other goats are no doubt resting in a grove of Mountain Cedar trees that provide a blanket of nettles to lie on and a canopy of shade from above to keep them cool.
The cats are off hiding under the house or in the cabin or who knows where, taking their afternoon siesta. This time of day I never see them.
Rick and I spend most mornings outside working but around noon both of us have to come inside to eat, rest, and do indoor type work. It is just too hot to be outside in the middle of the afternoon. This summer has not been as brutal as last summer, but we have had our share of 100 degree days (38c and above).
Though the animals need to be tended to every day, they are not our primary focus. Even when we were busy building the goat enclosure, in the back of our minds was our primary mission—people. In recent weeks more of our attention has been turned to that mission.
The primary reason this land was purchased has always been to provide a place for people with Multiple Chemical Sensitivities to live. For the past few months we have been in the planning stage of building one room cabins. These cabins will come equipped with a kitchenette and a bathroom will be shared between two cabins. The cabins will not be luxurious, but will be a roof over someone’s head. They will also have electricity.
Electricity does not just happen. It takes a lot of work and a lot of money. About a month ago Rick and I drove to Junction, about 50 miles (80.47km) north of here, to talk to someone at the Pedernales Electric Coop. office.
In the 1930’s most of rural America did not have access to electricity. It took an act of the federal government to change that. By providing federal assistance, electric coops could be formed whose sole purpose is to construct power lines and provide electricity to ranches and farms across the nation. Pedernales is one of those coops.
When I first moved to this property Pedernales had already installed a power pole and electricity to the house. All I had to do was join the coop for a small fee. Unlike for-profit electric companies that most people in the US get their electricity from, Pedernales is a not-for-profit cooperative, which means I am not just a customer, I am a member of Pedernales cooperative. As a member I vote in elections for board members, have a vote in changing any and all governing documents, and I have a say in what goes on.
Though there is a power pole on the property, it feeds the house and the bill is in my name. It just made since to have another pole installed in the ministries name and located where the cabins will be built. So Rick and I drove to the Pedernales office in Junction, TX to learn what it will take to have a separate power pole installed. The short answer is a lot of work and money.
The day after we visited the Pedernales office two engineers came out to the property to take a good look at what we wanted. With clear instructions of the process we then got to work.
Step one: Clear the land. We spent several weeks cutting down Mountain Cedar trees and hauling the branches away. There were also huge rocks that had to be removed. Pedernales requires a 20 foot (6.10meters) wide easement for their power poles and rocks and stumps have to be no higher than 3 inches (6.72cm) for their trucks to safely pass over. Since the power pole will be installed close to the property line, we were fortunate that Pedernales only required us to clear out a 10 foot (3.5meters) wide path. Even that was a lot of hard backbreaking work. But we got it done.
Step two: Survey. Once the land was cleared the two Pedernales engineers returned to survey the area and place markers where the poles and other equipment would go. This task was accomplished last week.
Step Three: Payment. We were told it would take a week to get the paperwork completed and the actual cost to be calculated. Yesterday Rick and I drove back to the Pedernales office in Junction so that I could sign the paperwork and make the necessary payments. Pedernales demands payment up front, which I can fully understand. The total cost to them came out to $4256.77. This total includes the cost of making the ministry a member of Pedernales, but by doing so we avoid taxes. It will also make it much easier to know how much electricity each cabin is using.
Step Four: Building the rack: Before Pedernales will come out to install the power pole, we have to build a rack for the electrical boxes. So as soon as we were done at the Pedernales office, we drove another 50+ miles (81+km) to Kerrville, where we stopped at the Electrical Supply store. The materials to build that rack came to $2095.94.
This morning Rick started the process of building the rack. This is not an easy job as he must put two metal pipes a minimum of 24 inches (60.96cm) into the ground. Jesus said a wise man builds his house on rock and not sand. Well, these cabins are being built on solid rock. Rick has to dig two 24 inch holes into solid rock. Not an easy job.
Step Five: Once Rick finishes building the rack Pedernales will come out and install the power pole and hook up the electricity.
“Therefore whoever hears these sayings of Mine, and does them, I will liken him to a wise man who built his house on a rock. And the rain came down, and the floods came, and the winds blew and beat on that house. And it did not fall, for it was founded on a rock. And everyone who hears these sayings of Mine and does not do them shall be compared to a foolish man who built his house on the sand. And the rain came down, and the floods came, and the wind blew and beat on that house. And it fell, and great was its fall.” (Matthew 7:24-27)
(Please remember Alpha Omega Christian Communities For The Chemically Injured is a not-for-profit Christian ministry. We are dependent on the generous contributions of God’s people.)
Saturday, July 7, 2012
Tale Wagging Dinner Time
Sport was born on June 29, only 9 days ago. It has been fun watching him grow right in front of our eyes. He is so funny when he gets his bottle we just had to share.
Friday, June 29, 2012
The Lord Keeps On Giving
Life with the goats has become routine now that their
home is basically finished. Unlike the
garden where they were hanging out, their new enclosure has plenty of weeds for
grazing (and I planted some Bermuda grass) so I no longer have to buy hay for
them anymore. I also have been counting
the days tell Midnight, my little Black Spanish buck is weaned.
We still have a few tasks to do but since the main
purpose of AOCCCI is people, not ranching, our focus has changed to other
urgent tasks. This week we have been
clearing land of Cedar trees so an electric pole can be installed for the
cabins that eventually will be built. We spend our mornings out working in the heat
and our afternoons inside working and resting where it is cool.
We were in the middle of our lunch, looking forward to
resting from the exhausting work, when the phone call came. When I answered the phone my friend simply said,
“Do you want another kid?” I looked across
the table and asked Rick, “He wants to know if we want another kid?” Rick jokingly asked me “whose kid?” Rick’s attitude was “If God is going to
supply we should accept”. So I told our
friend yes, and an hour later he arrived with the newest addition to our little
goat family. One look and I knew we had
a Boar goat. Upon further investigation
it appears we have another boy, a buck.
Rick wants to name him Spot because it appears he has some spots on him,
and it will confuse people since Spot is usually a dog’s name.
His first feeding.
He was born this morning.
Monday, June 25, 2012
Thursday, June 21, 2012
New Digs
Today marks a mile stone here at The Ranch. Today the goats were moved into their new
digs. There is still some work left to
do such as painting the fence posts, finishing up the loafing shelter for the
goats and building them some toys to climb and play on. But the fence is complete and so this morning
we moved their things into the new goat enclosure. I can already tell the goats are much happier
in their new digs. They went from the
garden which has no shade and nothing left to eat in it to a quarter acre enclosure
with trees for shade, plenty of weeds and grass to munch on, room to run around
in, and space to just be by one self if desired.
Subscribe to:
Posts (Atom)